Want to reinvent your fireproofing projects to cut costs, improve durability, and simplify compliance? Our UL-certified solutions install faster, last longer, and maximize project profitability in industrial, commercial, petrochemical, and military applications.
Built-in corrosion inhibitors stop moisture damage before it starts.
No sandblasting, priming, or mesh required, reducing labor and material costs.
Faster curing and fewer rework issues keep construction and maintenance on schedule.
Withstands harsh conditions in offshore, petrochemical, and industrial settings.
50-60% recycled content with 90% lower carbon emissions than portland cement.
UL-certified for ASTM E119/UL263 & UL1709, ensuring compliance without complexity.
This vessel skirt and tower support remain in excellent condition, thanks to FP250’s superior durability and corrosion resistance. Fireproofed in 2022 for a West Texas oil & gas project, a 2024 inspection confirmed its long-term performance—no cracks, debonding, or degradation.
Contact us to speak to a team member, see a demonstration, or schedule a site visit!
View our Privacy Policy.